Open Access

Table 4.

DARWIN2.3 computation results and associated uncertainties. C/E-1 stands for Calculation/Experiment-1. The nuclear data uncertainties (not taken in the uncertainty budget of the C/E-1) have been computed thanks to covariance propagation with the quadratic summation method.

Reacto Ass. Burnup Cool. C/E-1 Nuclear data
(MWd/t) time (y) (%), 1σ unc. (%), 1σ
San Onofre 1 (14 × 14) C01 26540 8.25 −1.45 ± 6.47 3.60
C16 28462 8.25 −0.49 ± 6.37 3.52
C19 30426 8.25 −1.85 ± 6.15 3.44
C20 32363 8.25 −3.70 ± 6.02 3.37
D01 31393 6.46 −3.12 ± 5.78 3.46
D46 32318 6.47 −1.71 ± 5.75 3.42
E18 32357 4.91 −1.35 ± 5.45 3.40
F04 30429 2.95 −0.92 ± 3.76 3.48
Point Beach 2 (14 × 14) C52 31914 4.48 −5.57 ± 3.34 3.57
C56 38917 4.48 −5.26 ± 3.07 3.32
C64 39384 4.48 −4.84 ± 2.74 3.31
C66 35433 4.47 −6.16 ± 3.15 3.43
C67 38946 4.47 −6.36 ± 3.06 3.32
C68 37059 4.47 −4.59 ± 3.12 3.38

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.