Table A.3.

General information for assembly 0E2 – part 3.

Assembly 0E2 Cycle C2 Cycle C3 Reference
Power operation 305 days 323 days [3], page 226/253
Subcritical 47 days 49 days [3], page 226/253
Start date 24/07/1984 11/07/1985 [3], page 226/253
Stop date 25/05/1985 30/05/1986 [3], page 226/253
Average Boron content (see note 6) 389 ppm 452 ppm [3], page 226/253
Assembly burnup (MWd/kg) 7.496 13.034 [3], page 228/253

Assembly 0E2 Cycle C4 Cycle C5 Reference
Power operation 335 days 338 days [3], page 226/253
Subcritical 47 days [3], page 226/253
Start date 18/07/1986 04/08/1987 [3], page 226/253
Stop date 18/06/1987 07/07/1988 [3], page 226/253
Average Boron content (see note 6) 402 ppm 401 ppm [3], page 226/253
Assembly burnup (MWd/kg) 11.308 9.790 [3], page 228/253

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.