Table 2

Fuel cycle costs from table S-1 in 2017 cost basis report [3].

Component CBR module Units 2017$ 2020$
Natural Uranium Mining and Milling A1 $/kgU 86 89.44
Conversion Process B $/kgU 13 13.52
Enrichment C1 $/kg-SWU 125 130
LEU Fuel Fabrication (PWR UO2) D1-1 $/kgHM 400 416
LEU Fuel Fabrication (BWR UO2) D1-1 $/kgHM 400 416
Remote handled fuel fabrication from reprocessed material D2/F2 $/kgHM 1400 1456
COEX Total Aqueous reprocessing of UOX fuel F1 $/kgHM 1562 1624.48
Electrochemical and remote handling fuel recycle D2/F2 $/kgHM 1200 1248
Co-located storage of reprocessed transuranic fuel material E3-1B $/kgTRU 950 988
LWR Construction R1 $/kWe 4400 4576
LWR O&M Fixed Component R1 $/kWe-yr 73 75.92
LWR O&M Variable Component R1 $/kWh 0.0018 0.001872
Fast Reactor Construction R2 $/kWe 4100 4264
Fast Reactor O&M Fixed Component R2 $/kWe-yr 76 79.04
Fast Reactor O&M Variable Component R2 $/kWh 0.0022 0.002288
Aqueous reprocessing derived HLW conditioning, storage, and packaging G1-1A $/kg 5700 5928
Electrochemical reprocessing derived HLW conditioning, storage, and packaging G1-2A $/kg 17214 17902.56
Spent fuel conditioning, storage, and packaging G2 $/kg 135 140.4
Geological Repository for spent fuel L1 $/kg 600 624
Geological Repository for HLW L1 $/kg 6000 6240

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.