Open Access

Table 1

Operating assumptions for existing reactors.

Reactor Power Spent fuel End date
[GWe] [teU/year]
Hunterston B 0.96 26 2031
Hinkley point B 0.95 26 2031
Dungeness B 1.05 29 2031
Heysham A 1.26 34 2027
Hartlepool 1.18 32 2027
Heysham B 1.23 33 2031
Torness 1.19 32 2031
Sizewell 1.20 29 2055

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.