Open Access
Table 6
Sequence of small break loss of coolant accident.
Time | Event |
---|---|
0 s | Small break (10 mm diameter) on DVI line B |
188 s | Low PRZ level leads to CMTs injection, PPHX actuation and coolant pumps stop |
190 s | Reactor scram triggered by pumps low speed (90%) |
193 s | Low PRZ pressure actuates reactor protection signal which triggers secondary lines isolation |
194 s | Emergency condensers are connected to SGs |
5 min | Apparition of a vapour phase in vessel upper head. Bulk boiling occurs in the reactor vessel |
25 min | Flashing of water into steam in the CMTs |
47 min | Low CMT levels actuate ADS opening |
58 min | ADS final stage opening |
59 min | Break flow turns into vapour phase. Beginning of accumulators injection (finished 100 s later) |
1 h 4 min | Beginning of safety tanks injection |
2 h 47 min | End of simulation |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.