Table 2.
Example of the JHR loading plan.
Example of loading plan A.U. = Access Units |
|||
---|---|---|---|
Type of experiment | Associated AccessUnit per experimentand per cycle | Number of JHRlocations for thetype of experimentconsidered | Cumulated number of Access Units per year (on the basis of 7 cycles per year) |
Fuel ramps studies (ADELINE) | 10 | 3 | 210 |
Fuel loop steady-state studies (MADISON) | 12 | 2 | 168 |
Fuel loop for LOCA studies (LORELEI) | 14 | 0, 3 (we consider only 3 LOCA tests per year) | 30 |
Fuel capsule studies (FUCA) | 10 | 4 | 280 |
Material capsule studies in core (MICA) | 8 | 3 | 168 |
Advanced MICA in core | 12 | 2 | 168 |
RPV studies in reflector (OCCITANE) | 8 | 2 | 112 |
Corrosion studies (CLOE) | 12 | 1 | 84 |
FR material studies | 14 | 1 | 98 |
TOTAL | 100 | 1318 |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.