Open Access
Table 1
Chronology of major events.
Event | Time [s] – Experiment | Time [s] – CATHARE 3D |
---|---|---|
Break valve open | 0 | 0 |
Initiation of coastdown of primary coolant pumps | 11.5 | 12 |
Initiation of HPI system in loop with PZR (loop-A) only | 26 | 27 |
Initiation of core power decay | 30 | 30 |
Initiation of ACC system in loop-A only | 154 | 158 |
Core reflooding | 182 | 176 |
Upper plenum filling | 195 | 190 |
Primary coolant pumps stopped | 261 | 262 |
Termination of ACC system in loop-A only | 350 | 340 |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.